Depth see in the Alte Brücke with new parapets manufactured from sandstone Because the provisional Center part of the bridge was only huge plenty of for two highway lanes, a complete reconstruction on the bridge was soon prepared. Nonetheless, this reconstruction did not materialize as a consequence of a hefty Charge estimation. For that reason, i